Early System Visibility Identifies a Critical Bottleneck Before Startup

Cooling Water Modeling Uncovers Hidden Constraint

A planned unit expansion created uncertainty around whether an existing cooling water circuit could support new heat exchangers without affecting current users. A calibrated hydraulic model gave the project team clear visibility into flow distribution and uncovered a critical bottleneck that would have restricted flow at startup. The analysis also revealed a no-cost optimization opportunity through jumper valve adjustments, improving overall system performance. Download the case study to see how early modeling reduced operational risk and increased confidence in the expansion.