Boiler Feedwater Assessment Uncovers Hidden Pump Degradation

 

When a Gulf Coast refinery needed to determine whether future boiler feedwater demand would require additional pump capacity, field-validated testing revealed a different issue. One of four parallel pumps had experienced 90.4% performance degradation and was contributing no flow to the system.

Hydrus Works confirmed that the remaining three pumps could meet both current and anticipated future demand while maintaining N+1 redundancy. The findings allowed the refinery to address the degraded pump and avoid an unnecessary capital purchase.

Download the case study to see how field measurements and performance modeling replaced assumptions with a clear capacity decision.